Mechanical & Hydraulic Systems
Comprehensive inspections and servicing were carried out on the aft gangway hydraulic system, including piston maintenance. Hydraulic system improvements and pump servicing restored full operational efficiency, while chilled water valves were also overhauled.
Engine Room
The engine room ceiling panels were replaced, improving both accessibility and long-term maintenance efficiency.
Hull, Superstructure & Exterior
Targeted paint touch-ups were completed on the superstructure, inner bulwarks, hatches, and masts. The cap rail was repaired and repainted, and new technical flooring was manufactured and painted in the bow area.
Sailing & Deck Equipment
A full rigging inspection was performed, covering stays, halyards, blocks, and winches. The sailing system rig check was completed, and the tender pole was serviced and load tested.
Interior & Outfit
Upholstery works included repairs to external covers, cushions, and windbreakers, alongside the production of new cushions, bags, and covers. Carpentry support and targeted interior repairs were also executed.
Electrical & HVAC
Ventilation for the Lutron panel was improved, and electrical upgrades were completed in the guest areas.
This refit project reflects our commitment to technical excellence, precision planning, and the highest standards of workmanship, ensuring S/Y Panthalassa is fully prepared for her next voyages.